Automatic transfer switches in an emergency power system: what they do and how they are tested
How automatic transfer switches work in an emergency power system: transfer times, open vs closed transition, bypass-isolation and testing.
Texxas Power/Resources
Practical guides for facility managers, owners and engineers planning standby power in North Texas: sizing, testing, fuel, siting, monitoring and grid reliability.
How automatic transfer switches work in an emergency power system: transfer times, open vs closed transition, bypass-isolation and testing.
What NFPA 110 acceptance and commissioning testing is, what gets witnessed on site and what documents a facility should receive at handover.
NFPA 110 generator maintenance and testing explained: weekly inspection, monthly exercise under load, annual and 36-month tests, load banks and records.
What NFPA 110 and related codes expect of a commercial emergency generator installation: location, fuel, air, alarms, wiring and DFW permits.
Which codes a Texas commercial generator answers to besides NFPA 110: NFPA 99, Joint Commission, CMS, DFW fire codes and EPA diesel rules, by building type.
A plain-language glossary of 29 terms facility managers meet on emergency generator projects: EPSS, ATS, AHJ, Level, Class, Type and more.
NFPA 110 Type, Class and Level explained with tables: how fast power returns, how long it runs and how a Texas facility ends up with its classification.
What NFPA 110 is, which Texas facilities it applies to and how Texxas Power installs and tests to it. Start here for the full NFPA 110 guide.
What ERCOT conservation appeals, emergency alerts, SB 6 and the January 2026 federal order mean for a DFW facility with a standby generator.
How critical load status works in Texas, who restores a business after an outage in DFW, and what it does not guarantee. Rules and Oncor routes explained.
What ERCOT large-load growth and the interconnection queue mean for a DFW business: what is growing, what SB 6 changed and what to do.
How to choose a commercial generator installer: 13 questions on licensing, insurance, testing and service, plus a print-ready checklist.
Generator remote monitoring with Generac Mobile Link for commercial generators: what it reports, WiFi or cellular and what happens when a fault is flagged.
Commercial generator installation process and timeline in DFW: the seven stages, what sets the pace at each and what shortens a project.
Commercial generator sizing: load list, demand vs connected load, motor starting, voltage and phase, and fuel type. A DFW guide, no square-foot shortcuts.
Generator clearance requirements for commercial standby generators: distances from openings, fuel storage, noise, access and how the code and manual set them.
UPS vs generator vs battery storage for a business: what each does, the transfer gap, how they work together and when a generator alone is enough.
N+1 redundancy and generator paralleling explained: how paralleled sets compare with a single generator, and what N+1 buys and what it adds.
Diesel fuel shelf life, fuel polishing and testing for standby generators: how long diesel lasts, what contaminates it and how to compare fuels.
Generator load bank testing and wet stacking explained: how a load bank test differs from an exercise run, what NFPA 110 says and when to test.
Free site assessment
Tell us what has to stay running. We walk the site, review your panel schedule and demand history, and give you a written proposal with the reasoning in it.