Texxas Power · Builder and Developer Partners

Build Generator-Ready, Not Generator-Retrofit

A standby generator is far cheaper to plan for than to add after the fact. Texxas Power works with builders and developers across Prosper, Celina, Frisco and the wider metroplex to wire new homes for generator readiness at rough-in, before drywall, before landscaping, before the driveway is poured. Your buyers get a clean upgrade path instead of a retrofit project, and your sales team gets a defined, bounded scope they can quote with confidence.

  • Texas Electrical Contractor License #41809
  • Authorized dealer: Generac, Kohler, Champion
  • Our own licensed electricians on every job

Talk to Our Builder Team

Texxas PowerRough-in at a glance
When
At rough-inBefore drywall and landscaping
Panel
Space reservedFor a future transfer switch
Conduit and gas
Stubbed and cappedSized for the generator class
Windows and doors
5 ft clearanceAlso fresh-air intakes
From the wall
18 in minimumService and exhaust side
Service access
3 ft clearKept free of hardscape

The case for planning early

Why Rough-In Timing Matters

Once a home is closed in, with walls finished, landscaping in, and the driveway and hardscape poured, adding a standby generator later means cutting into finished work to route conduit and gas line to wherever the pad ends up going. Planning for it during rough-in avoids all of that. Conduit gets run while the walls are open. Gas line gets stubbed while the plumber is already on site. The pad location gets reserved before the yard's final layout is locked in by landscaping and hardscaping.

For a buyer who wants a generator at move-in, this is the difference between a same-scope addition and a full retrofit project. For a buyer who does not want one yet, it is a clean, low-cost future upgrade path instead of a "we would need to tear things up" conversation two years from now.

The rough-in scope

What “Generator-Ready” Actually Means at Rough-In

This is not a vague add-on line item. It is a specific, well-defined scope.

Panel Space Reserved

The main electrical panel is set up with the knockouts and conductor slack needed to add a transfer switch later, without relocating or rebuilding the panel. A small step at rough-in that avoids a much bigger job after close.

Conduit Stubbed to the Future Pad Location

Empty conduit is run from the panel to the reserved pad site and capped, sized for the expected generator class. The electrical path already exists when a generator is added, and nothing is trenched through a finished yard.

Gas Line Stub, Sized and Labelled

An interior gas line stub with a shutoff valve is placed and labelled for the expected generator capacity class, so whoever makes the gas connection later knows exactly what it is sized for without guesswork.

Pad Location Reserved Before Landscaping Locks It In

The generator's eventual site is planned against the clearance requirements for windows, doors, fresh-air intakes and service access, before landscaping, hardscape or HVAC condenser placement makes that spot unavailable or non-compliant later.

The buyer's side

What This Saves Your Buyers

  • No cutting into finished walls, driveways or landscaping to add conduit or gas line after close.
  • No risk of discovering, after the yard is finished, that the only viable pad location conflicts with a window, vent or HVAC unit.
  • A generator upgrade becomes a straightforward equipment-and-pad job instead of a full electrical and gas retrofit.
  • One clear cost story for your sales team. Generator-ready is a defined, bounded scope at rough-in, not an open-ended promise.

Permits and inspections

The Permit Sequence, Handled Correctly

Permitting timelines vary considerably across the metroplex. Dallas and Fort Worth frequently turn a residential generator permit around the same day, while Highland Park, University Park, Southlake, Flower Mound, Frisco and Plano generally take longer. We schedule against the specific jurisdiction rather than an average.

At Rough-In

The rough-in wiring and conduit are typically covered under the home's existing building and electrical permits. No separate permit is needed at this stage.

At Installation

A separate electrical permit is required when the transfer switch and generator are installed. We pull it and handle the inspection, whether that happens at move-in or years later.

Getting started

How Working With Texxas Power on a New Build Works

01

We Coordinate at the Rough-In Stage

We work with your trades during rough-in to add the panel space, conduit stub and gas line stub to the build. A defined, bounded addition to the existing electrical and plumbing rough-in scope. All electrical work is performed by or under the direct supervision of our own licensed electricians. It runs under our own electrical contractor licence.

02

The Buyer Decides When

Some buyers want the generator installed before move-in. Many prefer to wait. Either way the expensive, disruptive part is already done during construction, so installing the actual generator later is a straightforward equipment job.

03

We Install Whenever the Buyer Is Ready

Whether that is before closing or two years later, we pull the required permit, connect to the pre-stubbed conduit and gas line, and complete the installation without any retrofit work.

Track record

We Have Done This Before

Generator rough-in on new residential construction is work we already do, on real builds, with builders and developers we work with regularly.

References on Request

We are not naming the builders here. That is their business rather than ours. References are available directly if you want to speak to someone before committing to a scope.

Documentation for Your Vendor File

If your process requires documentation before a trade goes on the list, our capability statement carries the license, insurance, capacity and coverage detail in one place.

Common questions

Frequently Asked Questions

(817) 439-9009
Does generator-ready rough-in commit us to a specific generator brand or size?

No. The rough-in scope of panel space, conduit and gas stub is sized to accommodate the expected generator class for the home, and the buyer chooses their brand and specific model when they are ready to install. We install Generac, Kohler and Champion.

What if a buyer never installs a generator?

The rough-in components simply sit unused. Capped conduit and a labelled gas stub carry no ongoing cost or maintenance burden for a home that was built generator-ready but never gets one.

Does this affect the home's electrical permit or inspection at handover?

No. The rough-in work is covered under the home's standard build permits. A separate electrical permit is only needed later, at actual generator installation, and pulling it is our responsibility at that point.

Can you coordinate directly with our electrical and plumbing trades during the build?

Yes. That coordination during rough-in is the whole point of this approach, and we do the electrical rough-in work ourselves rather than handing your trades a specification sheet and hoping it gets followed.

Is this service residential, commercial, or both?

The rough-in scope described on this page is for residential developments, which is where our new-construction work has been to date. On commercial projects we have worked on remodels and retrofits rather than ground-up construction. If you are planning a commercial build, talk to us about it directly and we will tell you honestly what we have and have not done.

Who holds the license and the insurance?

Texxas Power Home Services LLC, under Texas Electrical Contractor License #41809, regulated by the Texas Department of Licensing and Regulation. Certificates are available on request.

Do you also work on the homes themselves after handover?

Yes. HomeSafe Generators and Electrical is our residential brand, same licensed team, and handles the homeowner relationship after close. Your buyers deal with a company that already knows the house.

Builder enquiries

Building in DFW? Let's Talk.

If you are planning homes in Prosper, Celina, Frisco or anywhere across the metroplex, the cheapest time to make them generator-ready is before the drywall goes up. Tell us where you are building and we will walk your team through exactly what the rough-in scope involves and what it costs.

  • Call
  • Emergency
    24/7, same numbers
  • Offices
    13013 Harmon Rd, Suite 1305, Fort Worth, TX 76177
    3400 Carlisle St., Suite 320, Dallas, TX 75204
    8105 Rasor Blvd., Suite 218, Plano, TX 75024

Talk to Our Builder Team

Tell us where you are building. We'll come back with next steps.